موقع حكومي رسمي تابع لحكومة المملكة العربية السعودية
كيف تتحقق
روابط المواقع الالكترونية الرسمية السعودية تنتهي بـ gov.sa

جميع روابط المواقع الرسمية التعليمية في المملكة العربية السعودية تنتهي بـ sch.sa أو edu.sa

المواقع الالكترونية الحكومية تستخدم بروتوكول HTTPS للتشفير و الأمان.

المواقع الالكترونية الآمنة في المملكة العربية السعودية تستخدم بروتوكول HTTPS للتشفير.

Official government website of the Government of the Kingdom of Saudi Arabia
How to verify
Links to official Saudi websites end with gov.sa

All links to official websites of government agencies in the Kingdom of Saudi Arabia end with gov.sa.

Government websites use the HTTPS protocol for encryption and security.

Secure websites in the Kingdom of Saudi Arabia use the HTTPS protocol for encryption.

Bridge Project at the Intersection of King Abdullah Road with Prince Turki Bin Abdulaziz I Road

The Bridge Project at the Intersection of King Abdullah Road with Prince Turki Bin Abdulaziz I Road  is part of the development project of Prince Turki bin Abdulaziz I Road axis, which aims to improve its efficiency and ease traffic congestion on King Fahd Road.

The  bridge should increase the total capacity of Prince Turki bin Abdulaziz I Road to 120,000 vehicles per day, in addition to improving traffic flow along the adjacent road network. The project is part of the five-year plan for the development of metropolitan road network, which included the development of a 32-km-long section of Prince Turki bin Abdulaziz I Road between King Salman Road and the Southern Ring Road. The aim is to transform this road into a main axis of vehicular traffic crossing the city towards the north and the south and to be an adjunct to King Fahd Road.

The 886-meter-long bridge covers a total area of 1.6 square kilometers and is cladded with 16,307 square meters of back-lit aluminum panels that add an aesthetic touch to the intersection. Moreover, the project includes construction of pedestrian sidewalks along the bridge, and diversion/development of road service and utility networks, including electricity, communications, lighting, flood drainage and irrigation.

The project also includes the construction of a main two-way road with three lanes in each direction, in addition to at least two-meter-wide service road with two lanes that gradually widen into four lanes at the intersection.